- Once your job is complete a representative from Granite Direct will contact you to either come and pick up your final job or schedule an installation date.
For Installs ONLY:
- Often times you will be given a window of 3 hours for the arrival of our install crew (this may vary according to how busy the day is).
- We ask that someone be present on site for when the installers arrive.
- Installation normally takes a few hours, however some larger jobs may take longer. Our installers are artists; they must create a furniture top that is durable, and visually stunning.
For the install we require:
- Sinks to be on the jobsite.
- Faucets and fixtures on the jobsite.
- Running water.
- Electricity.
- The faucet holes will be drilled on the jobsite.
- We recommend that you remove everything from the cupboards prior to the installation to avoid inevitable dust that the install process may create.
- Very important please note: if backsplashes are installed, expect some type of gap (Stone is not flexible) between the drywall and the backsplash, especially if the walls are not perfectly straight. In order to resolve this problem please advise your drywall finisher and/or painter. Our installers can fill the gap with clear silicone at the time of the installation free of charge, but only if requested by the customer.
- When the material is installed and cleaned, our technicians will apply a penetrating sealer to the surface of the material.
- At this time this installation is complete and the installers will collect the final payment.
- Before our crew leaves they will ensure that the site is left clean to your satisfaction.
|